Friday, May 22, 2009

Production Meetings

Today I had a production meeting at 9:00am to talk about the new developments in the set design and to relay those changes to Shawn. I am his proxy until he gets in on Sunday.

David and I were at the theater today setting up sound equipment and dusting off the instrumentation. I set up the patch cabling and got it all pretty and ready to for the first show. I left early due to feeling under the weather and came home and relaxed a bit. Am still recovering from some strange allergy/cold thing, though I am getting better by the day.

1 comment:

Unknown said...

Glad you are feeling better and that things are falling into place. How is Eric adjusting? Hugs to you both.